Skip to content
oBizee / FIELDNOTES
GUIDE 107 / Shipping

Plan dispatch capacity for a festival order spike

Plan festival dispatch capacity from packing time, stock, materials and carrier cutoffs before promising a large promotional order window.

4 min read · estimatePublished by oBizee · Editorial approach

Handle the work after an order is placed →

A festival promotion can generate orders faster than a small team can inspect, pack and hand them over. The problem often appears after the announcement, when the public delivery promise is already more ambitious than the operation.

Plan dispatch capacity before opening the offer. Use realistic bottlenecks, not the maximum number of labels someone can print in an hour.

Map the full dispatch process

List picking, inspection, assembly, personalisation, packing, labelling and carrier handover. Include any work that must happen before a parcel can leave.

Measure representative orders rather than timing the easiest item in an empty room. Mixed baskets and gift messages may require more attention.

Keep production time separate where made-to-order items are involved. Finished stock and future making capacity are different limits.

Identify the narrowest stage

If inspection can handle thirty orders but packing can safely handle twenty, printing forty labels does not create forty dispatches.

Consider workspace, equipment and experienced staff as well as hours. A second helper may need supervision rather than immediately doubling throughput.

Record the limiting stage so the team knows where extra support would genuinely help.

Prepare materials and stock

Check boxes, protective materials, labels and the products needed for the advertised offer. A missing small component can stop an otherwise prepared order.

Separate stock already reserved for existing customers from the quantity available for the campaign.

Use the inventory guide to avoid treating the same units as both committed orders and promotional availability.

Build a conservative daily plan

Estimate the number of orders that can be completed accurately within the actual working window. Leave room for exceptions, rework and missed handovers.

For illustration, ninety minutes of packing capacity at six minutes per representative order supports fifteen orders before adding a buffer. It does not support thirty because the labels print quickly.

Use your observed timings, and review the estimate when the basket mix changes.

Align the customer promise

Work backwards from supported carrier handover and delivery estimates. Distinguish dispatch deadlines from arrival expectations.

Do not advertise a guaranteed festival arrival without a basis in the service and the shop's own capacity. Where uncertainty remains, explain it before the order is accepted.

Update public cutoffs when the queue fills. An old banner can keep creating commitments after the team has reached its limit.

Define an order cap or pause rule

Decide what happens when the day's manageable capacity is reached. You may move new orders to a later dispatch window or pause the offer.

Make the revised timing visible before commitment. Do not keep accepting under the original date and send apologies later as the normal process.

Assign someone to monitor the queue, not just promotional engagement.

Prepare helpers and exceptions

Give helpers clear product references, packing instructions and stop rules for damage, missing variants or unclear custom details.

Do not let speed override a customer agreement. A silent substitution may save a minute and create a much larger support problem.

Keep an exception area and owner so uncertain orders do not block every straightforward order or disappear into the packed pile.

Reconcile at each handover

Confirm which parcels were actually collected and which remain. A printed manifest is not proof that every parcel on it left the premises.

Send dispatch updates from verified handover events. Keep missed pickups visible and revise the next day's plan accordingly.

After the festival window, review actual timings, error rates and unfinished work. Use that evidence for the next campaign rather than remembering only the peak order count.

A successful order spike is one the business can fulfil accurately. Capacity planning protects the customer experience and gives the promotion a limit the team can honour, even when demand is stronger than expected.

Prepare a short end-of-day exception list containing the order reference, blocking issue and next owner. Keep complete addresses in the controlled fulfilment system. This lets the morning team resume safely without searching through late-night messages.

Use this guide, then test your own workflow.

Examples are illustrative. Confirm current features, charges and suitability before making a business decision.

Explore this topic → · Find an oBizee setup guide · Ask about your store